Bridging for Developers

Property Development

Last updated

If you are a developer, the risk that matters most is losing the site. We arrange bridging finance that lets you buy it fast, then hold it while planning moves, development finance is arranged or enabling works begin. For the build itself, see development finance on developing.fund.

Current rates and costs · 167 lenders active in the market · Every fee in writing before you commit

Discuss your deal Always confidential. No obligation.

£200k–£100m+

Loan Size

12 to 24 months

Typical Term

some lenders go to 36 months

Typically up to 75% LTV

Loan to value

Key Features

What We Offer

Site acquisition funding

You can buy the site quickly while you arrange longer-term funding.

Holding finance while planning progresses

You can hold the land while planning progresses, without tying up your own capital.

Light enabling works

Some facilities include light enabling works such as demolition and site clearance.

Multiple site strategies

We can arrange finance for several sites at once, built around your pipeline.

Speed in competitive situations

When another developer is circling the same site, speed of funding is your edge.

Ideal For

What does it look like in practice?

One land deal shows the point. The site had planning, and the buyer paid £3.3m. The valuer's first figure matched the price. We presented a different valuation approach and comparables, the lender accepted them, and the figure was revised past £5m. That revision was the valuer's own opinion. Four situations come up most:

Site Acquisition Before Development

You have found the right site and development finance is not in place yet. The bridge secures it.

Holding Land Between Phases

You have finished one phase and need to hold the rest of the land while the next phase is planned and funded.

Bridge to Development Facility

You need a short bridge while development finance is arranged. We coordinate with developing.fund on the handover.

Light Enabling Works

You need site clearance, demolition or early works before the main facility starts.

Typical Costs

What will a development bridge cost?

Illustrative: every case is priced individually, so treat these as a guide to budget. Our calculator gives a figure for your own deal.

Interest

Interest usually rolls up into the loan, so you do not normally make monthly payments.

Lender Arrangement Fee

Typically 1% to 2% of the gross loan.

Valuation

The lender instructs the valuer, because the report is for the lender. You pay for it, either directly to the valuer or through the lender, who takes the fee upfront.

  • On a loan of around £200k: nil to about £100 for a desktop valuation, up to about £2,000 for a full one, plus VAT.
  • On larger loans: £500 to £3,000 or more.

Legal Fees

Your solicitor and the lender's solicitor.

  • On a loan of around £200k: about £1,500 to £2,000 for each side, plus VAT.
  • On larger loans: £1,500 to £5,000 or more for each side.

Exit Fee

0% to 1% of the loan, where charged. Some lenders charge none.

Our Fee

Our fee is generally 1% of the gross loan, due on completion.

How It Works

How does a site purchase bridge work?

1

Tell us about the site.

Share the site details, the purchase price, your plan and the planning status. We will say whether a standalone bridge, a bridge into development finance or a combined route suits it.

2

We secure the site.

We arrange the bridge to buy it. Completion is typically 5 to 7 working days; some deals take longer, up to around 14, with the valuation usually the slowest step. You control the asset while planning and pre-construction work go ahead.

3

You move to development finance.

When you are ready to build, we coordinate with developing.fund to arrange the development loan. It repays the bridge. Not sure which you need? See bridging vs development finance.

Who Is This For

Who uses it?

Most borrowers are established developers who need a site secured before the full facility is ready. Others are land bankers, holding a strategic position while planning moves or the market improves. First-time developers use it to secure a first site. Joint venture partners use it when one side brings the land and the other brings the development skill.

Common Questions

Development bridging questions

Is this development finance?

No. This is bridging finance for developers. We arrange it for the site purchase, holding costs and light enabling works. For ground-up development finance, with build-stage drawdowns and lending against the GDV, we work with developing.fund.

Can I buy a site without planning permission?

Yes. Some lenders will fund land with no planning permission. We arrange finance for sites at pre-application, outline consent or full permission. Planning status changes the LTV and rate, but it does not stop you securing the site. See our land finance pages for more.

What is the difference between bridging and development finance?

Bridging is usually a single drawdown against the current value of an asset. Development finance pays out in stages during construction. It is underwritten against the Gross Development Value (GDV), with a monitoring surveyor inspecting at each stage. Bridging is faster and simpler. Development finance is more involved but funds the build.

How will the lender value my site?

The valuer looks at the site as it stands today, including its planning status. A site with full planning is worth considerably more than one without. A RICS valuer works from comparable land sales and the residual value, which is what a developer would pay for the consented scheme.

Can I include demolition or site clearance costs?

Often, yes. Some facilities include light enabling works such as demolition, site clearance and ground preparation. Each case is assessed individually. Heavier work involving new construction usually belongs in development finance.

How long does a site purchase bridge take?

Completion is typically 5 to 7 working days; some deals take longer, up to around 14, with the valuation usually the slowest step. Where another buyer is pushing, faster timelines are possible if valuations and legals move quickly. Speak to us before you exchange or make an offer.

Can I use bridging to buy several development sites?

Yes. We can structure separate loans or one portfolio facility. Developers building a land bank to feed a pipeline of projects often do this.

Site Types Lenders Will Fund

What do lenders think of different sites?

Lender appetite varies by site type and planning stage. A consented brownfield site in a strong residential market lends very differently from a greenfield holding with no consent. Knowing which lenders suit each profile, and at what LTV, is the start of a properly priced facility.

Brownfield with Full Planning

With planning risk lower, the GDV clear and comparables in place, lenders usually find this profile easier to fund. Some lenders offer higher LTVs and sharper pricing here.

Sites with Outline Consent

The principle is settled but reserved matters remain. Bridging is widely available at a slightly lower LTV. Many investors buy, then progress reserved matters before moving to development finance.

Pre-Application Land

This covers land before planning is sought, either greenfield inside a local plan allocation or land with positive pre-application talks. Fewer lenders, usually at lower LTVs.

Permitted Development Conversions

Office, light industrial or retail to residential under permitted development rights. Some lenders are comfortable with prior approval and conversion programmes.

Infill and Single Plots

One-house, two-house and small backland schemes. Development finance lenders often find these too small. Bridging followed by a self-funded or private build loan suits them.

Regeneration and Mixed-Use Schemes

Larger sites with several use classes, public realm contributions or section 106 obligations. Bridging can fund site assembly, hold through pre-construction or refinance an existing facility while the final phases are pre-sold.

What Lenders Need

What will a lender ask to see?

Development bridging needs more paperwork than a standard residential bridge. Having it ready at the start has the biggest effect on how long completion takes. Organised sites often complete in 5 to 7 working days. Without the paperwork, expect it to run longer.

Site Plan and Title Pack

A detailed site plan, the Land Registry title plan and any conveyancing reports. On multi-title sites or adopted highways, the title alone can take weeks to settle.

Planning History and Decision Notices

The full history, current consent, conditions, reserved matters status, S106 obligations and any pre-commencement conditions. The lender's solicitor and valuer both check it.

Development Appraisal

GDV, build cost, fees, finance costs, contingency and your profit. Lenders run their own residual valuation, but a credible appraisal speeds underwriting.

CIL and S106 Position

Your Community Infrastructure Levy figure, any S106 payments and their status. Unplanned CIL or S106 costs have sunk development deals, so settle them early.

Exit Evidence

If the exit is development finance, an indicative DIP or term sheet. If it is a sale, expressions of interest. Bridging into an unfunded pipeline is one of the riskier profiles a lender sees.

Your Track Record

A CV or portfolio of past schemes with completion evidence. First-time developers can still be funded, but may pay a small premium and face a slightly lower LTV.

Avoid These Mistakes

Where do development bridges go wrong?

They fail for reasons standard residential or commercial bridges do not share. Planning, build cost and onward finance each add their own risk.

Planning takes longer than planned

"Reserved matters in three months" rarely survives a real planning department. Terms are most commonly 12 to 24 months, and some lenders go to 36. If your programme runs longer, you need staged finance or a longer bridge from the right lender.

Optimistic GDV

Lender valuers run cautious models. Figures built on the boldest comparable are often written down. Use mid-range comparables and you avoid a painful renegotiation.

Light works that are not light

In a bridge, "light enabling works" means demolition, site clearance and groundworks. Starting the main build is a common cause of refused drawdowns and a rushed refinance.

No exit lender

The bridge is the easy part. The development facility that follows has to suit the asset, your track record and current criteria. Talk to the exit lender before you draw the bridge.

A cost plan that does not hold up

A monitoring surveyor's QS will test your build costs. A plan signed off by an engaged QS or contractor carries more weight than a rough estimate.

Related Use Case

Refurbishment or development: which bridge fits?

The line is not always obvious, and the product matters, because the LTV, drawdown structure, term and lender pool differ.

A refurbishment bridge fits when the property already exists and the work improves it. Think kitchens, bathrooms, layouts, light structural work, EPC upgrades or an HMO conversion. It is usually a single drawdown, with the works funded from your equity or a retention released in stages. See our refurbishment bridging page for rates and LTV bands.

A development bridge fits when the project involves a ground-up build, a change of use or major structural change. It also fits any case where the finished asset is fundamentally different from the one you buy. Drawdowns follow the QS's progress reports, and the underwrite is led by the GDV.

Hybrid cases are common. A refurbishment that needs planning, changes the use or lifts the value by around 15% starts to look like development. In practice we route the case to the lender whose product matches the actual works, not the label you give it.

When does a refurbishment bridge become a development bridge? Usually when one of three things happens. The works need planning permission. The use changes, such as commercial to residential or a house to an HMO. Or the expected value uplift passes about 15% of current value. Any one of those points to a development structure. Talk to us about the specifics and we will say which fits.

Ready to Discuss Your Deal?

Get an indicative quote or arrange a call with a specialist. We read every enquiry the same working day and usually reply by phone, often within a couple of hours.