Light & Heavy Refurbishment Finance

Light and Heavy Refurbishment Bridging Loans

Last updated

A refurbishment bridging loan funds the purchase of a property and the works, and is repaid by a sale or a longer-term loan. Light refurbishment is cosmetic work that needs no planning or building regulations sign-off. Heavy refurbishment is structural work, change of use, or anything that needs planning consent, and the money is drawn in stages. Indicative terms within 4 hours on straightforward deals, often quicker.

Today’s rates and costs 167 lenders active in the market Every fee in writing before you commit
Discuss your deal Always confidential. No obligation.

£200k to £100m+

Loan Size

12 to 24 months

Typical Term

some lenders go to 36 months

Typically up to 75% LTV

Loan to value

Key Features

What We Offer

Light & heavy refurbishment funded

Cosmetic upgrades through full structural overhauls, conversions and change-of-use schemes — we match the facility to the scope of works.

Purchase + works in one facility

Day-one advance funds the purchase up to LTV, works budget held in retention and released against the surveyor's progress reports.

Light refurb, typically 5-7 working days

No staged drawdown: funds are released in one tranche. Heavy refurb adds a few days for the staged structure.

Buy, refurbish, refinance (BRR)

Buy below market, renovate to uplift, refinance onto a long-term product at the improved value — extracting your capital.

Repaying early

Where there is an early repayment charge, it is usually three months' interest; very occasionally six; some loans have none.

1st and 2nd charge available

Need to keep the existing senior facility in place? We have lenders who take a clean second charge against the project.

Ideal For

Common Scenarios

Investors flipping for resale

Buy below market, refurb, sell at full value within 6–12 months. Light refurb deals typically complete in 5-7 working days.

Landlords adding to their portfolio

Buy a doer-upper, refurb to lettable standard, refinance onto a buy-to-let mortgage at the post-works valuation.

HMO converters

Buy a 3–4 bed house, convert to a 5–6 room HMO, refinance on the higher post-works valuation. Specialist lenders for HMO conversions.

Auction buyers

Properties bought at auction often need work to be mortgageable. Bridging covers both the purchase and the refurbishment in one facility.

Two Routes

Light vs Heavy Refurbishment

We split refurbishment bridging into two routes. The choice drives both the speed of completion and which lenders compete for your deal.

Light Refurbishment

Cosmetic and non-structural work. New kitchens, bathrooms, redecoration, flooring, light electrical. No planning permission, no building regs sign-off needed. Funds drawn in one tranche.

Light refurbishment rates start from 0.60% a month (lowest published lender rate, first charge, as at 20 November 2026). Typically 5-7 working days to complete.

Heavy Refurbishment

Structural work, extensions, loft conversions, change of use, anything requiring planning consent or building regs. Funds drawn in stages against works completed.

Typically 5-7 working days, towards the upper end.

Refurbishment bridging comes from specialist lenders

Refurbishment bridging is provided by specialist lenders. They include private funds and family offices. We compare terms from the 167 lenders active in the market and tell you early which fit your deal. Many people ask whether their bank will do it. Our guide explains why banks take weeks and bridging takes days.

Heavy Refurb In Detail

Heavy Refurbishment Finance

What counts as heavy refurbishment. Heavy refurb sits between cosmetic light-touch work and ground-up development. It typically involves one or more of: structural alteration (load-bearing walls, new openings, foundation work), change of use (commercial-to-resi, single-dwelling-to-HMO), planning permission required (loft conversion, side or rear extension, basement dig-out), or a material uplift in value. If any of those apply, the deal needs a heavy refurbishment facility rather than a light refurb bridge.

Why heavy refurb sits between bridging and development finance. Pure development finance is geared around build-cost drawdown against a clean planning permission and a programme of works. Standard bridging assumes the property is broadly mortgageable at funding day. Heavy refurbishment finance bridges that gap — the asset is being materially changed, so the lender underwrites both the day-one position (purchase + current value) and the end position (GDV after works), and structures drawdown around interim QS-validated progress. It's a hybrid product, and lender appetite varies sharply with the works profile.

LTV bands typically available. Lenders typically go up to 75% LTV on a first charge. A few lenders will go higher with additional security. The figure depends on the property, the exit and the lender. The works budget is retained by the lender and released in tranches.

Drawdown structure. Funds release in stages against works completed, validated by a quantity surveyor or monitoring surveyor.

Typical timelines. Bridging terms are most commonly 12 to 24 months; some lenders go to 36 months. Heavy refurb schemes build in time for slippage; schemes that need longer than the bridge allows are usually edging toward needing development finance instead. Exit is normally either sale (flip) or refinance onto a buy-to-let or commercial-mortgage on the post-works valuation — our bridging calculator gives a quick scenario read; for a live scheme, arrange a call.

How It Works

From Application to Completion of Works

1

Application

Tell us about the property, the works, and your exit (sale or refinance). We do a soft credit footprint at this stage only — no hard search until you're ready to proceed.

2

Indicative terms

Within 4 hours on straightforward deals, often quicker, with indicative LTV and rate. Indicative terms are a guide, not an offer. Credit-backed terms are an offer from the lender, subject to its conditions.

3

Valuation

A RICS surveyor values both the current state ("market value") and the post-works value ("gross development value" or GDV). The valuation drives the maximum loan size.

4

Legals

Your solicitor and ours work in parallel. Straightforward cases typically complete in 5-7 working days, and light refurb without complications often closes at the quick end of that.

5

Drawdown & exit

Funds released to your solicitor on completion. For heavy refurb, the works budget is held back and released in tranches as the project progresses. You exit by refinancing or selling.

Loan Parameters

Headline Numbers

Loan size

£200k to £100m+

LTV

Typically up to 75% on day one; a few lenders will go higher with additional security. Works funded on top against GDV.

Term

12 to 24 months; some lenders go to 36 months

Rates

Light refurbishment from 0.60% a month (first charge, as at 20 November 2026).

Charges

1st and 2nd charge available

ERCs

Where there is an early repayment charge, it is usually three months' interest; very occasionally six; some loans have none.

Common Questions

Refurbishment Bridging FAQ

Can I borrow for both the purchase and the refurbishment?

Yes. The day-one advance funds the purchase up to our LTV limit, and the works budget is held in retention and released against the surveyor's progress reports.

Do I need planning permission to apply?

Not for light refurbishment. For heavy refurbishment that needs planning, tell us where the application stands and we will say early what the lender will need.

What if the works run over budget?

If the works run over budget, talk to us early; what can be done depends on the lender and the deal.

How fast can a refurbishment bridge complete?

Refurbishment bridges typically complete in 5-7 working days from application. Heavy refurb adds a few days for the staged drawdown structure to be agreed.

Can I exit by refinancing rather than selling?

Yes. A refinance onto a buy-to-let or commercial mortgage is a common exit.

What is heavy refurbishment finance?

Heavy refurbishment finance is a short-term loan structured for property projects involving structural change, change of use, planning-permission works, or a material uplift in value. It sits between standard bridging (where the property is already broadly mortgageable) and development finance (ground-up construction). Funds release in stages against QS-validated progress reports, with the works budget retained by the lender on day one.

How does heavy refurbishment funding differ from a standard bridging loan?

A standard bridge assumes the asset is mortgageable at funding day and lends against current open-market value. Heavy refurbishment funding underwrites both the day-one position and the post-works GDV, structures drawdown in stages tied to a QS report, and runs terms that allow for the works programme (terms are most commonly 12 to 24 months; some lenders go to 36 months).

What heavy refurbishment loan rates are available in 2026?

Heavy refurbishment rates start from 0.66% a month (lowest published lender rate, as at 20 November 2026). Pricing widens with leverage, works complexity, and exit risk. Published heavy refurbishment rates across 13 lenders run from 0.66% (lowest) to 1.00% (highest) a month, as at 20 November 2026. Live rate movements across our 167 lenders are published on our rates page.

More: works on a shop with flats above are covered in our mixed-use bridging loans guide.

Ready to Discuss Your Deal?

Get an indicative quote or arrange a call with a specialist. We read every enquiry the same working day and usually reply by phone, often within a couple of hours.